Do you want to know, Projects
We have done so far?

Rail Lines (Air Tightness and Internal Overpressure Tests)

Rail Lines (Air Tightness and Internal Overpressure Tests) As a certified testing company, PowerQ assisted the JV main contractor to

Read More

Air Tightness and Internal Overpressure Test (ATT/IOPT) for Rail Line BV Station

Rail Lines (Air Tightness and Internal Overpressure Tests) As a certified testing company, PowerQ assisted the JV main contractor to

Read More

Vibration Monitoring at OYO FPSO

OYO FPSO (Vibration Monitoring) The E-House contractor had installed HVAC packages on E-House and was concerned about high vibration level

Read More

Failure of Fan Filter Units Due to Possible Strong EMF from Superconducting Magnetic Sources

Fan Filter Units (FFU) Failures Due to Strong EMF In year 2009, PowerQ had conducted an Electromagnetic Field survey emitted

Read More

Relay Tripped at Chemical Plant, Pasir Gudang

Relay Tripped at Pasir Gudang Plant After a series of ACB tripping at Main Switchboard of a chemical plant in

Read More

O&M Manual Development for Applied Material (AMAT) Plant

Operation and Maintenance Manual Development To complement T&C work, PowerQ was appointed to complete an additional task that was to