Do you want to know, Projects
We have done so far?

Gas Meter Validation (LNG Plant)

This is an onshore LNG import/export terminal comprising of facilities for LNG unloading/reloading, LNG storage, Boil-off Gas (BOG) Handling, LNG send-out, LNG re-gasification and natural gas metering and regulation.

Read More

Marina Bay Sands Inspections

PowerQ was part of the Commissioning Team for Integrated Luxury Resort, Singapore project. This integrated resort is located in Central Singapore. We had performed the mechanical T&C works to the MBS representative's satisfaction.

Read More

Harmonics Testing

PowerQ had performed a Harmonics study for the largest heavy lift & pipe laying vessel. The power system was modeled using SKM software and harmonics were predicted & compared to class limit. The results of simulations were validated on-site by conducting an actual simulation.

Read More

Beijing Yintai Centre

Beijing Yintai Centre is located in the core of Beijing's Central Business District. It is a three-tower structure with 63-levels, 118,519 square meters consisting of 237-rooms Park Hyatt Hotel, 44 luxury apartments and 216 service apartments. Flanking this main tower are two 186-metre-high office towers.

Read More

Power System Analysis

This document presents a few of the practical problems in power systems experienced on site. Electro Magnetic transients, harmonics, TRVs are to name a few. It is essential for systems located in a place with high lightning activity to have appropriate lightning and earthing protection.

Read More