Do you want to know, Projects
We have done so far?

Sprinkler Audit and Testing at Printer Assembly Electronics Plant

Sprinkler Test and Audit LM, a world class printer system manufacturer, required an independent Third Party to survey and audit

Read More

Justification of VCB selection for LNG plant- Effect of TRV

Justification of VCB Selection (LNG Plant) Transient recovery voltage is the transient across a circuit breaker. TRV is a decisive

Read More

Lightning Protection Review for CPP in Natuna Sea

Lightning Protection Study (CPP in Natuna Sea) Introduction: The west Natuna Sea, Indonesia records a relatively high lightning activity, where

Read More

TP DP Upgrade (Engineering and Project Management)

TP DP Upgrade (Engineering and Project Management) Located next to container terminals, TP-Singapore DP comprises of two 5-storey blocks offering

Read More

Chennai Techpark (Feasibility Study)

Chennai Techpark (Feasibility Study) Designed by renowned architect Zaha Hadid Ltd-UK, Chennai Tech Park is located in Ambattur Chennai. PowerQ

Read More

Power System Upgrade – Security Installation

Power System Upgrade for Security PowerQ had performed power measurements on Switch Boards to determine the sufficient margin of capacity

Read More