FPSO (Short Circuit Analysis)
FPSO (Short Circuit Analysis) During FPSO conversion project, the ship side system – 440LV Emergency Board, 65KA was retained and
Modelling for Optimal Voltage Distribution
Modelling for Optimal Voltage Distribution Modelling determines the Optimum Generation and Distribution Voltage for planting a Medium Voltage (MV) Prime
Harmonics Mitigation
Harmonics Mitigation In order to ensure adequate distribution of electrical load to new and existing tenants, the building management had
Greenfield Biologicals Vaccine Plant (Commissioning)
Greenfield Biologicals Vaccine Plant (Commissioning) Since first quarter of year 2008 to early 2010, client had continuously engaged PowerQ’s services
Inspection of Electronics Facility
Inspection of Electronics Facility M.E.S electronics plant had encountered with an incident where a water pipe had leaked in the
MEPF Commissioning – Yintai Centre, Chaoyang District, Beijing
Beijing Yintai Centre (MEPF Commissioning) Beijing Yintai Centre is located in the core of Beijing’s Central Business District. It is