Commissioning of Pipe Laying Dynamic Positioning Ship
Commissioning of Pipe Laying Dynamic Positioning Ship In the first and second quarter of year 2015, PowerQ had performed commissioning
Sports Hub Bowl Performance and Heat Stress Test
Sports Hub Bowl Performance and Heat Stress Test In year 2014, PowerQ had performed testing and commissioning services for a
Pipe Airlock Problem in University
Pipe Airlock Problem in University PowerQ was invited to investigate the airlock which resulted in no space cooling in conditioned
Greenfield Offshore Production Yard (Design and Engineering)
Greenfield Offshore Production Yard (Design and Engineering) In the early year 2009 to late 2010, PowerQ had provided a comprehensive
Discoverer Drillship (Engineering Support)
Discoverer Drillship (Engineering Support) In the first quarter of year 2010, PowerQ had performed a study to upgrade power system
Lightning Protection Review
Lightning Protection Review GB project (WP and CPP) was located in an open sea with high isokeranic level. When completed