Sprinkler Audit and Testing at Printer Assembly Electronics Plant
Sprinkler Test and Audit LM, a world class printer system manufacturer, required an independent Third Party to survey and audit
Justification of VCB selection for LNG plant- Effect of TRV
Justification of VCB Selection (LNG Plant) Transient recovery voltage is the transient across a circuit breaker. TRV is a decisive
Lightning Protection Review for CPP in Natuna Sea
Lightning Protection Study (CPP in Natuna Sea) Introduction: The west Natuna Sea, Indonesia records a relatively high lightning activity, where
TP DP Upgrade (Engineering and Project Management)
TP DP Upgrade (Engineering and Project Management) Located next to container terminals, TP-Singapore DP comprises of two 5-storey blocks offering
Chennai Techpark (Feasibility Study)
Chennai Techpark (Feasibility Study) Designed by renowned architect Zaha Hadid Ltd-UK, Chennai Tech Park is located in Ambattur Chennai. PowerQ
Power System Upgrade – Security Installation
Power System Upgrade for Security PowerQ had performed power measurements on Switch Boards to determine the sufficient margin of capacity