VT Expansion included a new 22,000 cubic-meter Third Party Chemical Tanks in Singapore.

VT expansion project had included additional 18 tanks with associated processes and utility systems. The raw material is generally offloaded from ships and transferred to storage tanks and finally to trucks through pumping systems which are monitored and controlled by a custody metering and system.

The EPC contractor engaged PowerQ to provide engineering services for electrical and instrumentation system. PowerQ reviewed the other similar terminals and studied the existing facilities. We had designed the electrical and instrument system for storage of multi-specialty chemicals for Vopak terminal.

PowerQ developed design documents for:

  • Electrical specifications for switchgears, MCC, VSD cables and grounding to meet Eex class requirements
  • Electrical load flow, short circuit and motor starting study using SKM Power Tools software
  • Schematic and layout drawings for supply to pumps and offloading systems
  • Tank Area and street lighting
  • Instruments specifications for flow metering, radar tank gauging system and truck offloading system
  • Schematic and layout drawing, control and wiring diagram for instrument and control system

PowerQ reviewed the existing system and liaised with vendors and term maintenance contractor to produce improved design documents to integrate with the existing system.