The Marina Bay Sands (MBS ) www.marinabaysands.com is developed by one of the world’s biggest entertainment companies, Las Vegas Sands, at Marina Bay waterfront in central Singapore. We are perform the T&C work to MBS representative satisfaction under the general supervision and direction of the MBS, Consultants and our clients.
Since August 09 PowerQ has been involved [...]
In 2009 , PowerQ conducted an Electromagnetic Field survey emitted from crystal growth furnace to find out level of interference that caused to damage several Fan Filter Unit (FFU) at new Wafer plant, Tampines , Singapore.
Enginners from PowerQ installed EMF data logger to measure and monitor with data logger to generate a clear picture of [...]
After a series of ACB tripping at Main Switchboard, Chemical plant project in Pasir Gudang, Malaysia , client commissioned PowerQ to investigate cause by monitoring the electrical system. PowerQ performed the monitoring of the Main Control Centre Board and spot measurement of the MSB supplying power to MCC.
The inrush current was recorded at individual motors was [...]
Murata electronics plant had an incident where a water pipe had leaked in the Process area. The owner took a proactive approach to investigate the condition of piping and had requested TKS to conduct necessary investigation and audit to check integrity of the system. PowerQ was called upon to assist TKS to inspect the length [...]
Lexmark, a printer system manufacturer, required an independent 3rd Party survey and audit of their fire sprinkler system for the Lexmark Electronics Facility –Cebu Philippines. The fire sprinkler system was surveyed, and results recorded. A comparison of compliance to NFPA Codes, specifically NFPA 13 and 20, was used as a basis for ascertaining the degree [...]
PowerQ undertook the audit of Citibank Data Centre by teaming up with Singapore Telco and Emerson. The review, measurement and monitoring was conducted by Tampines Singapore. The facility contains several data centres each having its dedicated CRAU’s which are supplied by central CHW system. The Citibank DC is supplied by 14 . CRAUs supplying cool [...]
PowerQ performed power measurements on Switch Boards to determine the sufficient margin of capacity for a future upgrade.
The power monitoring was conducted at Main Switchboard and SSB. The measurement was conducted using power quality monitor Fluke 434. The objective of the work was to carry out a power measurement with a view to determine the [...]