The Marina Bay Sands (MBS ) www.marinabaysands.com is developed by one of the world’s biggest entertainment companies, Las Vegas Sands, at Marina Bay waterfront in central Singapore. We are perform the T&C work to MBS representative satisfaction under the general supervision and direction of the MBS, Consultants and our clients.
Since August 09 PowerQ has been involved [...]
The E House contractor has installed HVAC packages on Ehouse and was concerned about high vibration level before starting up the system. The contractor SPL has commissioined PowerQ to perform vibration measurement at Compressor and AHU compare against benchmarks and advise practical solutions to mitigate the impending problem.
Our enginners reviewed the installtion drawing, alignment and factory report [...]
GB Project (WP and CPP) location is in an open sea with relatively high lightning activity. When completed this project shall bring gas to Singapore through a 300km subsea pipeline. The facilities at WP and CPP are electrical system, radio telecommunication system (VSAT), Instrumentation system and pipelining. The electrical system is in construction stage. A lightning [...]
To complement T&C work, PowerQ was asked by Main contractor Taikisha provide additional support to write O&M Manual for HVAC system for new grennfield plant at Changi south. To meet high standard of Applied material project the remit was to produce a narrative and illustrative document and not merely compilation of drawing, specs and catalogues [...]
A new underground MRT line called as circle line is being constructed in Singapore. As certified testing company PowerQ worked with SETSCO services and assited the main contractor to conduct a crucial testing by pressuring the entire building like a balloon. The purpose of the ATT is to provide an indication if the Civil Defense Shelter [...]
In 2009 , PowerQ conducted an Electromagnetic Field survey emitted from crystal growth furnace to find out level of interference that caused to damage several Fan Filter Unit (FFU) at new Wafer plant, Tampines , Singapore.
Enginners from PowerQ installed EMF data logger to measure and monitor with data logger to generate a clear picture of [...]
After a series of ACB tripping at Main Switchboard, Chemical plant project in Pasir Gudang, Malaysia , client commissioned PowerQ to investigate cause by monitoring the electrical system. PowerQ performed the monitoring of the Main Control Centre Board and spot measurement of the MSB supplying power to MCC.
The inrush current was recorded at individual motors was [...]
Murata electronics plant had an incident where a water pipe had leaked in the Process area. The owner took a proactive approach to investigate the condition of piping and had requested TKS to conduct necessary investigation and audit to check integrity of the system. PowerQ was called upon to assist TKS to inspect the length [...]
Lexmark, a printer system manufacturer, required an independent 3rd Party survey and audit of their fire sprinkler system for the Lexmark Electronics Facility –Cebu Philippines. The fire sprinkler system was surveyed, and results recorded. A comparison of compliance to NFPA Codes, specifically NFPA 13 and 20, was used as a basis for ascertaining the degree [...]
PowerQ undertook the audit of Citibank Data Centre by teaming up with Singapore Telco and Emerson. The review, measurement and monitoring was conducted by Tampines Singapore. The facility contains several data centres each having its dedicated CRAU’s which are supplied by central CHW system. The Citibank DC is supplied by 14 . CRAUs supplying cool [...]